PROPOSAL FOR REVIEW
PROJECT TITLE: PAPUA NEW GUINEA: CLIMATE CHANGE ASSISTANCE PROJECT
GEF FOCAL AREA: Climate Change
GEF ELIGIBILITY: Entry into Force of UNFCCC, March, 1994.
[x] Eligible under financial mechanism of UNFCCC
[x] Eligible under paragraph 9(b) of the Instrument
TOTAL PROJECT COST: $ 345,600
GEF FINANCING: $ 345,600
GOVERNMENT COUNTERPART OF GEF COMPONENT: in-kind contribution to the Financing project
COFINANCING/PARALLEL FINANCING: not applicable
ASSOCIATED PROJECT: not applicable
GEF OPERATIONAL FOCAL POINT: not available
GEF IMPLEMENTING AGENCY: UNDP
EXECUTING AGENCY: Government of Papua New Guinea
LOCAL COUNTERPART AGENCIES: Department of Environment and Conservation
ESTIMATED APPROVAL DATE: April 1996
PROJECT DURATION: 24 months
GEF PREPARATION COSTS: $ 24,000
COUNTRY AND SECTOR BACKGROUND
Country Description
Papua New Guinea's Forestry Sector
Environmental Commitments and Policy Framework in Papua New Guinea
Related Activities
(a) public awareness raising including the dissemination of information related to climate change and sea level rise in the form of a regional newsletter and press releases;
(b) education material development over the next two years for us in primary and secondary schools throughout the region;
(c) reports on data collected by the sea level gauges are regularly distributed by the Australian National Tidal Facility;
(d) general training in relation to the science of climate change (to be closely linked to PICCAP implementation; and
(e) research and data interpretation focused on the technology and approach to sea level monitoring as well as potential impacts in island countries (to be closely linked to PICCAP implementation).
(a) to sustain the PNG national forest estate for the purpose of producing a whole range of forest services and products, or alternatively to avoid or reduce deforestation;
(b) to achieve a balance between the use of forests for conservation and industrial production;
(c) where a decision has been made that the forest is to be used for industrial production, to ensure that it is managed for sustained yield and harvested to prescribed environmental standards;
(d) to improve the benefits flowing from the forest to the customary forest owners;
(e) to increase the forest owner's involvement with management of the resource.
PROJECT OBJECTIVES
Legal Premises
(a) Article 12 requires developing countries to prepare national communications, due three years after entry into force of the Convention. It is assumed for purposes of this project that this deadline will be extended in the case of Papua New Guinea, for which the Convention entered into force in March 1994.
(b) Article 4.1 calls on all countries to formulate and implement programs to mitigation and adapt to climate change.
Development Objectives
(a) Greater understanding of the relationship between climate change mitigation strategies and attainment of national sustainable development objectives. Where there are national programs aimed at ecosystem protection through forest and costal zone management, knowledge about the linkages between these programs and climate change mitigation needs to be reinforced among key decisionmakers.
(b) Strengthened cooperation and coordination among ministries, agencies, and institutions in areas pertinent to climate change. Despite the establishment of various governmental entities responsible for environment, implementing cross-cutting activities relevant to climate change will have the effect of improving coordination between government and research institutes, academic institutions, the private sector, and NGOs. A climate change policy dialogue process, including governmental, nongovernmental, academic, business, and grassroots organizations, will be created and strengthened to foster understanding of climate change issues and linkages among a wide stakeholder group. Providing this stakeholder group with access to the rapidly expanding information and expertise available through the Internet will also strengthen the framework. Given the recent frequency of governmental reorganizations in PNG, it is imperative to establish not only a broad ownership of any PNG climate change response strategy, but to take all opportunities to strengthen the strategy through internal and external networking.
(c) A capacity to financially engage a concerned international community capable of financing climate change mitigation projects that complement national sustainable development objectives. Concern over global climate changes is likely to result in enhanced availability of project funding related to climate change mitigation and perhaps also adaptation. The PNG Government has considerable interest in taking advantage of such opportunities, but has little knowledge of what the opportunities might be or how they might be exploited. Funding proposals that pursue these financing opportunities can concurrently advance climate change mitigation and national development priorities. Successful attraction of such funding, with the associated analysis and verification requirements, could establish a funding base and technical rationale for a self-sustaining administrative process. Carrying out the activities associated with this project will advance PNG's interests in this area.
Immediate Objectives
(a) To put into place the procedural and infrastructural elements that will form the framework for the rest of project activities.
(b) To enable PNG to fulfil its reporting obligations with regard to the development of an inventory of GHG sources and sinks. The resulting inventory will be able to be updated periodically in accordance with the IPCC methodology. Although primarily focused on land-use related CO2 sources and sinks, the inventory will also encompass energy related emissions as well as CH4, N2O, and CFC emissions.
(c) To enable PNG to fulfil its reporting obligations with regard to the identification of options for mitigating climate change, in both the land-use and energy production sectors.
(d) To enable PNG to fulfil its reporting obligations with respect to PNG's vulnerability to future climate change and sea level rise.
(e) To enable PNG to fulfil its reporting obligations with respect to its options for adapting to climate change and sea-level rise.
(f) To enable PNG to fulfil its reporting obligations with regard to the development of a national implementation plan.
(g) To enable PNG to fulfil its reporting obligations with respect to communicating information under Article 12 of the Climate Convention (national communications).
PROJECT DESCRIPTION
Strategy
Training
(a) In-Service Training: In-service training will include participation of governmental and nongovernmental representatives in national as well as international workshops and seminars organized through this project or carried out under the auspices of other GEF/UNDP projects. Training topics will relate to climate change vulnerability and adaptation, GHG inventory completion, UNFCCC national communications contents and formats, and assessment of GHG mitigation options relevant to the PNG context.
(b) Technical Expert and Consultancy Training: The project will provide technical experts to conduct studies, carry out analyses, and train national governmental and nongovernmental personnel on specific issues relevant to PNG that are not sufficiently covered through in-service training, or which require a more PNG-specific focus to be most useful. Consultants will provide technical expertise in areas such as forest GHG inventory assessment, and mitigation options in the oil and gas sectors.
Institution Building
Technical Discourse
Network Building
Institutional Framework
(a) Government of Papua New Guinea
Because of its stated environmental policies as well as PNG's national commitments under the UNFCCC, the government of PNG will be the executing agency for this project. Government inputs will include counterpart support, including allocation of technical experts, communication/office facilities, secretarial/administrative services, expertise in certain areas, and information services.
(b) Project Steering Committee
The Project Steering Committee (PSC) will be the project policy-making body that incorporates high-level representation of PNG government ministries and agencies. The PSC will oversee project implementation and ensure inter-agency coordination. The PSC will be comprised of representatives from government, PNG research institutions, NGOs, and a UNDP/GEF representative. A recommended PSC composition would include the Department of Environment and Conservation (DEC), the Foreign Affairs Ministry, the National Forest Authority (NFA), an NFCAP representative, the Agriculture Ministry, the new National Planning Office, the National Weather Service, University of Papua New Guinea, and selected NGO, community, and research institution representatives. Community participation would appropriately include representatives of landowner and Melanesian interests. Chairmanship of the PSC will rest with the DEC given its general portfolio, as well as its specifically assigned responsibility for UNFCCC implementation (a responsibility shared with the Foreign Affairs Ministry).
(c) Project Coordinator
A Project Coordinator (PC) will be selected based on technical and organizational capabilities. The PC should have proven experience in managing a broad-ranging technical and policy assessment process. The PC will coordinate project activities among governmental agencies and other participants. In order to foster institutional ownership of the process within PNG and to facilitate the sustainability of the process put into place through this project, the PC's salary will preferably be provided by DEC or another agency. The project will provide a full-time Technical Assistant to the PC and other technical support needs. The PC will be a member of and serve as secretary to the PSC.
(d) National Technical Committee
The National Technical Committee (NTC) will consist of individuals with expertise from relevant sectors, including government agencies, academic institutions, NGOs, and private sector organizations. Members of the NTC, supported as needed by national and international expertise, will be used to the extent possible to carry out the specific analyses called for as part of the project. The NTC will also enable project management to maintain contact with relevant constituencies and be a technical advisory body to the PC.
International Advisory Network
OUTPUTS AND ACTIVITIES
Objectives
Objective 1 (Infrastructure Development): To put into place the procedural and infrastructural elements that will form the framework for the rest of project activities.
Activity 1.1: Identify a local Project Coordinator/Manager and establish a Project Steering Committee with participants from all relevant sectors. With outside assistance as required the PC will prepare a detailed work plan for the project and identify the institutions that are capable of implementing different subcomponents of the project. During project implementation, the Project Steering Committee will:
(a) give guidance on, steer and monitor the implementation of the project;
(b) work as an additional information link between the project and the "outside world";
(c) establish permanent links to coordinate climate change related issues and initiatives in the country; and
(d) ensure and support smooth transition from this enabling activity to the actual implementation of the national GHG mitigation strategy and the identified GHG mitigation measures.
Activity 1.2: Assemble a National Technical Committee based on the work plan developed under Activity 1.1, and identify areas in which international consultant assistance will be required.
Activity 1.3: Identify and create links to both national and international sources of information (such as the US Country Studies Program and other bilateral programs, UNEP, IPCC, CC:TRAIN, international research institutes dealing with inventories, other climate change related issues, ongoing "enabling" activities in other recipient countries, etc.). These information sources will be utilized as appropriate to provide background training for the project, undertake the specific tasks of the project, learn from the experiences and ideas of similar kind of projects elsewhere, and avoid duplication of effort. Specific individuals will be recruited to form the International Advisory Network. The necessary equipment will be procured and installed to provide ready project access to available electronic networks (Internet + World Wide Web), both enhancing the effectiveness of the project and saving on travel costs.
Activity 1.4: Specific attention to dissemination of and public access to the available information (as well as to the results of this project) in order to enable a wide participation and involvement of all the interested individuals and organizations both during and after the project. Information dissemination efforts will rely as much as possible on existing information flows that can be taken advantage of by the project.
Objective 2 (Inventories): To enable PNG to fulfil its reporting obligations with regard to the development of an inventory of greenhouse gas (GHG) sources and sinks.
Output 2.1: Procedures for compiling a comprehensive national and regional (GHG) inventory appropriate for PNG.
Activity 2.1.1: Adapt the IPCC/OECD Greenhouse Gas Emissions Inventory Guidelines to the needs of PNG, taking particular advantage as appropriate of efforts through PICCAP to adapt the Guidelines to the particular circumstances of Pacific island states. In addition, a particular emphasis will be needed to reflect the importance of the forest sector to PNG's inventory activities.
Activity 2.1.2 : Adapt training materials and modules being developed by CC:TRAIN, PICCAP and other relevant projects.
Activity 2.1.3: Convene PNG Workshop to refine inventory procedures and data needs.
Output 2.2: Comprehensive PNG GHG inventory in accordance with IPCC/OECD Guidelines.
Activity 2.2.1: Identify any external expertise required to complete the identified inventory methodology.
Activity 2.2.2: Identify modifications to existing initiatives such as NFCAP components and the PNGRIS system that would generate valuable inventory data.
Activity 2.2.3: Carry out GHG inventory. Although primarily focused on land-use related CO2 sources and sinks, the inventory will also encompass energy related emissions as well as CH4, N2O and CFC emissions.
Objective 3 (Mitigation): To enable PNG to fulfil its reporting obligations with regard to the identification of options for mitigating climate change.
Output 3.1: National mitigation options that are appropriate for PNG, particularly long-term measures which are cost-effective and environmentally sustainable.
Activity 3.1.1: Participate in CC:TRAIN, PICCAP and ALGAS activities adapted to the mitigation options facing Pacific island nations.
Activity 3.1.2 : Convene PNG mitigation workshop with particular emphasis on land-use based mitigation measures.
Activity 3.1.3: Assign mitigation related research and policy analysis tasks to individual NTC members and groups of members based on their particular capabilities. The subjects to be covered will go beyond sectoral interventions such as forestry measures, and will include regulatory and legislative options (e.g. tariff and fiscal policies, tax incentives etc.) Capacity will be built in research institutes and NGOs working in particular sectors relevant to the mitigation assessment.
Activity 3.1.4: Evaluate PNG's GHG inventory to identify potential areas for reduction of sources and enhancement of sinks.
Activity 3.1.5: Define the range of possible mitigation options within the country.
Activity 3.1.6 : Identify and evaluate least-cost mitigation options for PNG, with a likely primary emphasis on the land-use and energy production sectors. Particular attention will also be paid to sectors whose GHG emissions may increase significantly over time, including the energy production and transportation sectors.
Activity 3.1.7 Create a PNG-specific Manual on Climate Change Project Development. This will be a well researched manual that provides a useful guide to the development of climate change mitigation project proposals that serve PNG's environmental and development priorities, and at the same time satisfy the requirements of climate change project funders. Maximum benefit will be made of similar manual development work in GEF's Maghreb and Sub-Saharan projects; it is anticipated that completion of the PNG Manual will require only modest modification of similar efforts currently underway in those projects. The Manual will be distributed to agencies and NGOs with a potential interest in project development.
Objective 4 (Vulnerability): To enable PNG to fulfil its reporting obligations with respect to its vulnerability to future climate change and sea level rise.
Output 4.1: Procedures for assessing PNG's vulnerability to climate change and sea level rise.
Activity 4.1.1 : Participate in CC: TRAIN, PICCAP and SPSLM activities focusing on vulnerability assessment in the Pacific island region.
Activity 4.1.2: Adapt available training materials and modules to any unique circumstances facing PNG, including importance of forest and marine ecosystems.
Activity 4.1.3: Conduct training of national stakeholders.
Output 4.2: A comprehensive set of PNG baseline data to use as reference points for assessing future vulnerability and adaptation options.
Activity 4.2.1: Define the information requirements.
Activity 4.2.2: Collect, evaluate and compile existing national and regional data, including data generated through the SPSLM project.
Activity 4.2.3: Identify data shortcomings.
Output 4.3: Comprehensive assessment of PNG vulnerability to climate and sea-level change.
Activity 4.3.1: Adapt scenarios developed by the PICCAP, SPSLM and Vulnerability Studies projects for future region-specific changes in climate and sea level and in related environmental, social and economic conditions.
Activity 4.3.2: Additional background research and policy analysis to fill any remaining gaps projects will be assigned to individual NTC members and groups of members based on their particular capabilities. Capacity will be built in research institutes and NGOs working in particular sectors relevant to the adaptation and vulnerability assessments. Particular attention will be paid to the potential implications of climate change for PNG's particularly complex forest ecosystems.
Activity 4.3.2: Conduct a national vulnerability assessment.
The special needs of small island developing states like PNG and their enhanced vulnerability to climate change has been recognized by the FCCC, the Agenda 21 and the Barbados Declaration for special attention.
Objective 5 (Adaptation): To enable PNG to fulfil its reporting obligations with respect to its options for adapting to climate change and sea-level rise.
Output 5.1: Procedures for identifying and evaluating adaptation options.
Activity 5.1.1: Participate in CC:TRAIN and PICCAP activities associated with the development of regionally appropriate procedures for identifying and evaluating adaptation options which are consistent with the IPCC Technical Guidelines.
Activity 5.1.2: Adapt training materials and modules as needed for use in PNG.
Activity 5.1.3: Conduct PNG stakeholder training.
Output 5.2: National options for adapting to climate change.
Activity 5.2.1: Define the range of options applicable to PNG, with a particular emphasis on forestry-based options.
Activity 5.2.2: Evaluate and identify least-cost national adaptation options.
Output 5.3 National options for coping with sea-level rise, including the analysis of options within an ICZM framework.
Activity 5.3.1: Participate in CC:TRAIN and PICCAP activities associated with the development of sea-level rise and costal zone management.
Activity 5.3.2: Define the range of options applicable to PNG.
Activity 5.3.3: Evaluate and identify least-cost national options, in the context of an ICZM framework.
Objective 6 (National Implementation Plans): To facilitate PNG's fulfillment of its reporting obligations through the development of a national implementation plan.
Output 6.1: Institutional framework and political support
Activity 6.1.1: Convene project institutions (see Objective 1 above)
Activity 6.1.2 : Participate in the planned PICCAP Regional Workshop to review guidance material and identify common elements and information needs.
Activity 6.1.3 : Adapt training materials and modules available through CC:TRAIN and other projects.
Activity 6.1.4: Training of national stakeholders through PNG workshops to raise national awareness and political support, and to develop guidance on national implementation plans.
Output 6.2: Nationally-endorsed implementation plan.
Activity 6.2.1: Prepare a PNG implementation plan.
Activity 6.2.2 : Convene national workshops for presentation to policy and decision makers.
Objective 7 (National Communications): To enable PNG to fulfil its reporting obligations with respect to communicating information under Article 12 of the Climate Convention (National Communications).
Output 7.1: Politically-endorsed and supported National Communication.
Activity 7.1.1: Participate in PICCAP Regional Workshop to take advantage of emerging guidelines and application procedures.
Activity 7.1.2 :Adapt training materials and modules as appropriate for PNG's special circumstances.
Activity 7.1.3:Conduct training of relevant PNG stakeholders.
Activity 7.1.4: Prepare National Communication.
Activity 7.1.5: Convene PNG workshops for presentation to stakeholders as well as policy and decision makers.
Monitoring and Evaluation
37. The project will emphasize internal monitoring and evaluation in order to optimize the process of inter-institutional transfer of knowledge and experience. External monitoring and evaluation procedures will be established to ensure conformance with emerging UNFCCC guidance, and to conform to related projects such as PICCAP. In addition, the proposed Project Steering Committee will be charged to maintain close project oversight including periodic technical and programmatic reviews. These reviews will be supported by regularly scheduled project progress reports. The purpose of the review will be to identify in the very early stages of the project the eventual gaps, overlaps and other risks of the successful implementation as well as to identify potential partners and sources of information of which the project could benefit. Every six months the Project Coordinator will prepare a progress report for the PSC that will be formally discussed during the Committee's regular meetings. A final evaluation of the project will be conducted in accordance with UNDP procedures.
38. A post-project evaluation will be undertaken by UNDP in collaboration with the relevant parties not later than one year after the termination of the project, in order to evaluate the extent to which the outputs of the projects are being used as intended.
RATIONALE FOR GEF SUPPORT
39. The project is consistent with the Operational Criteria prepared by the GEF Task Force on Climate Change in order to provide coordinated and timely assistance for countries to fulfill their commitments to the UNFCCC. This project responds to such objectives by implementing an activity needed to enable Papua New Guinea to prepare its first national communication to the Conference of the Parties. This will be accomplished primarily through the development of institutional capacity, training of personnel, information acquisition/dissemination, and dialogue/cooperation between government and non-government sectors. The direct benefit will be establishment of a long-term capability to advance sustainable development by the incorporation of climate change criteria into national decision making processes.
40. In addition to the immediate output of preparing the national communication, the project will build technical capacity and establish an institutional framework to facilitate the implementation and further development of the identified follow-up activities.
41. It is clear that in the absence of GEF financial support, this project is not possible and a valuable opportunity to influence the integration of climate change considerations into PNG's national development will have been lost. The activities described in this project brief are required as part of the UNFCCC and would not have been independently undertaken by PNG to address development goals.
SUSTAINABILITY AND PARTICIPATION
42. The Government of Papua New Guinea fully supports the objectives of this project and gives a very high priority to it. National development objectives and strategies are well served by the project through activities intended to foster advanced and sustainable resource management in PNG. In particular, the project's emphasis on climate change mitigation strategies that are compatible with long-term forest resource management and conservation will help stimulate national long-term support for the services and activities of the project.
43. The project emphasizes long-term capacity building and training that are intended to establish a permanent foundation for UNFCCC compliance. After the project has ended and the first national communication to the Conference of the Parties has been finalized, the Government will take responsibility to regularly update the inventory and prepare further communications in accordance with agreements reached by COP. It is expected that after successful completion of the project, the Project Steering Committee will continue to deal with UNFCCC related matters on a permanent basis.
Consultative and Participatory Processes
44. This proposal has been prepared by the GEF based on in-country consultations with individuals and/or panels in relevant institutions, including government ministries/department. Final project development will involve additional extensive consultations with these and other governmental, academic, research, and non-governmental agencies, including but not limited to:
(a) Government Ministries, Agencies and Departments: Department of Foreign Affairs; Department of Agriculture and Livestock, Department of Lands and Physical Planning; National Planning Agency; National Forest Authority; National Forest Board; National Forestry and Conservation Action Program.
(b) Academic and Research Institutions: University of Papua New Guinea; University of Technology.
(c) Nongovernmental Organizations: National Alliance of Non-Governmental Organizations; Foundation for the Peoples of the South Pacific; the World Wildlife Fund.
LESSONS LEARNED AND RESPONSE TO TECHNICAL REVIEW
45. Previous technical reviews of enabling activities processes under the UNFCCC have noted the importance of cooperation and networking of a broad range of experts. This leads to an exchange of information that is linked both nationally and internationally, and considerably strengthens the context within which the project is pursued. For this reason, this capacity building project emphasize the development of national expertise through training and the exchange of information.
46. Project design has also taken into account previous technical review of the National Forestry and Conservation Action Programme in PNG, which faced many of the same organizational issues that will face this project. That review, completed in 1994, noted the difficulties encountered in establishing a new institutional structure to address a specific topic like sustainable forest management. In that case it was found that it proved difficult for an externally established and funded entity to establish a sustained leadership role among the large group of PNG forestry stakeholders. As a result, this proposal avoids reliance on establishment of an implementation structure external to existing agencies, and focuses on establishing governmental ownership of the climate change response process.
47. Technical review comments have been incorporated.
PROJECT FINANCING AND BUDGET
48. The total GEF cost of this project is $345,600. As an enabling activity, this project would not take place without the UNFCCC. Therefore, the full costs of the project equal the incremental costs of the project. The GEF contribution will cover the costs outlined below. In addition to this, the PNG Government will make in-kind contribution including salaries for staff time associated with operation of the Project Steering and National Technical Committees. Other in-kind contributions will include basic communications and office facilities.
49. The most important circumstances facing PNG with respect to the budget required to fulfill its UNFCCC obligations are:
(a) the nascent state of knowledge and capacity in PNG on climate change issues generally, and relevant UNFCCC-required outputs specifically;
(b) the need to build broad-based ownership and capability into PNG's climate change response strategy if it is to prove sustainable;
(c) the importance of networking extensively with other ongoing efforts in the region and beyond; and
(d) the high costs associated with travel to and from PNG.
50. These circumstances require stretching the budget available for national enabling activities through the GEF. Several examples have been identified of how this project can cost-effectively build on other efforts underway in the region in order to maximize its own success:
(a) CC:TRAIN in coordination with the PICCAP project will be building national teams and helping the teams generate political support through awarenessraising and participatory activities aimed at policymakers. PNG will be able to utilize these efforts in advancing its own project agenda.
(b) The South Pacific Regional Environment Program (SPREP) will gain considerable resources and expertise through the efforts of PICCAP and CC:TRAIN. Close cooperation with SPREP will allow PNG to mobilize technical assistance and identify opportunities for collaboration in carrying out PNG's project.
(c) PNG will be able to take advantage of training carried out through PICCAP and CC:TRAIN regional workshops on such subjects as vulnerability and adaptation assessment, and compilation of national implementation plans.
51. The following budget reflects the particular circumstances facing PNG is carrying out this project, and the opportunities for maximizing its cost-effectiveness through cooperation and collaboration with parallel efforts that will already be underway.
INCREMENTAL COSTS
52. Preparation of national communications by developing counties is to be fully financed by the GEF for the UNFCCC. An incremental cost assessment for this project is therefore not required.
53. This project is consistent with the enabling activity and capacity building objectives listed in INC Document (A/AC.237/90/Add.3), prepared jointly by the interim secretariat of the UNFCCC and the GEF Secretariat in order to facilitation coordinated and timely assistance to countries for the implementation of the Convention. This project responds to such objectives by implementing an activity needed to enable this country to fulfill its commitments to implement the Convention.
ISSUES, ACTIONS AND RISKS
54. The project represents an approach to capacity building that emphasizes training, networking, and national dialogue. It is adapted to PNG's particular context and technical capabilities. The ultimate criterion of success will be whether a sustainable climate change assessment and reporting process is established, and whether the results of the project are incorporated into PNG's broader development goals. The project seeks to establish a long-term institutional framework for PNG compliance with its PNG obligations.
55. The risks associated with implementation of a project such as this one have been explicitly addressed in project design. One risk is that essential personnel and equipment resources may not be sufficient. Considering the specific outputs required of the project, a crucial element will be close collaboration among the different ministries and departments at the institutional level, as well as collaboration of the project personnel at the individual level with each other and the project support staff. The government of PNG, however, has committed the active participation of relevant agencies to the project. The project budget also provides for sufficient external expertise, equipment, and travel to accomplish the project's aims.
56. Another possibility in project implementation is that the methods and approaches used will not conform to the international framework for enabling activities being developed under the UNFCCC. To address this risk, the project will employ commonly accepted methodologies and will modify its approach as guidance from the Convention on issues including enabling activities become better defined. Relevant entities including the IPCC and UNEP will be consulted to ensure that the methods and details used in the project are appropriate. In order to avoid redundancy with other ongoing efforts and to promote effective project implementation, the project will also use the results of ongoing or finalized projects like the UNDP/GEF PICCAP and ALGAS projects, the sub-Saharan and Maghreb regional greenhouse gas mitigation projects, CC:TRAIN and related efforts, and relevant Country Study Programs including those of the U.S., the GTZ, and UNEP.
58. The frequent reorganization of governmental agencies and functions that often accompanies the rapid evolution of policy and administrative structures in many developing countries poses a challenge to the long-term institutionalization of PNG compliance with UNFCCC requirements. This risk in particular has been addressed through maximizing the likelihood of broad-based ownership of PNG's climate change response process by the country's governmental and non-governmental stakeholder communities. This ownership is strongly encouraged through extensive participatory and training activities, and by building as much as possible on existing infrastructural capacity within PNG's resource management agencies.
STAP REVIEW
PAPUA NEW GUINEA: NATIONAL GHG INVENTORY AND
ADAPTATION
ASSESSMENT PROJECT
1. The project is important since it will help Papua New Guinea (PNG) undertake its first national communication to the COP. PNG needs to prepare an inventory and a mitigation and vulnerability assessment, and to screen mitigation projects in order to prepare its COP communication. The proposed project will enable it to complete the above elements. The proposal is very well written and makes a clear and justifiable case for this support. I strongly encourage that the project be supported on the basis of the project brief.
APPROPRIATENESS OF THE PROJECT APPROACH
2. The project approach is aimed at enhancing PNG's capabilities for periodic data collection, completing an inventory of GHG emissions, analyzing the energy and land-use sector mitigation options and screening mitigation projects. In each case, the proposal provides sufficient background information on ongoing activiites, lays out the existing institutional framework, and highlights an approach by which project activities will be integrated into existing institutional plans. The approach is appropriate, and its success will be worth emulating in other countries.
OBJECTIVES OF THE PROJECT
3. The short-term project objectives are valid, appropriately focused and consistent with the PNG's development objectives.
ACTIVITIES
4. The activities noted in the brief are consistent with the stated objectives. The immediate outputs from these activities, are emissions and sinks inventory, mitigation assessment, national vulnerability and adaptation assessment, directly called for in the UN Framework Convention on Climate Change (UNFCCC).
COUNTRIES
5. The proposal is for PNG so no other countries are involved.
OMISSIONS IN BACKGROUND DISCUSSIONS
6. The background discussion and the information provided in it should note the methods developed by the US Country Studies Program for mitigation analysis, which would be of value for the completion of Output 3 of the assessment. Similarly, the 1995 IPCC Second Assessment Working Group II includes chapters on methodology for mitigation assessment, which the proposers should use once the project is funded.
INSTITUTIONAL ARRANGEMENTS
7. The proposed institutions have the relevant experience to participate in the project and appear capable of conducting the project. At the Project Document stage, these should be revisited to ensure that they are administratively and otherwise capable of conducting the project.
FUNDING
8. The overall funding levels are appropriate for a project of this type.
INNOVATIVE FEATURES
9. The proposal's stress on developing capacity for the collection of data and information is a useful feature. This will allow periodic updates of the inventory making it a "living document".
DEVELOPMENT DIMENSIONS AND RATIONALE FOR GEF SUPPORT
10. PNG policy emphasizes the need to approach national development in a way that protects ecological and human systems. Consistent with this policy, the project's emphasis on mitigation activities should help develop strategies and plans that will foster sustainable development of national forests.
11. The project objectives are consistent with the need to meet PNG's obligations under Article 12 and Article 4.1 of the UNFCCC.
QUESTIONS AND CLARIFICATIONS
12. None
ADDITIONAL COMMENTS
13. None
INCREMENTAL COSTS AND COST-EFFECTIVENESS
14. The project is consistent with the enabling activities component of the GEF Operational Strategy, and hence is justified in seeking the full cost of the project.
LETTER OF ENDORSEMENT
Date: 22 January 1996
TO: Peter Witham
Resident Representative
UNDP
P.O. Box 1401
Musgrove Street
Port Moresby
FROM: Iamo Ila
Secretary
Department of Environment and Conservation
P.O. Box 6601
Boroko
Papua New Guinea
Subject: PNG GOVERNMENT ENDORSEMENT OF THE CLIMATE CHANGE ASSISTANCE PROJECT
I have received the Project Document for funding of the Climate Change Project through the GEF programme.
I am pleased to inform you the project document is very much supported and endorsed by my department. It is important that as a requirement of the Climate Change Convention, it is necessary for PNG to communicate consistently with the requirement of the UNFCCC especially Article 4.1 and Article 12.
However I would like to point out here that the National Planning office needs to be informed about this project document, and suggests that the department will negotiate the procedures. Meanwhile the project should go before GEF Operation Committee (GEFOP) for funding consideration.
Thank you.
Sincerely,
Iamo Ilaformat
(Signed)
cc: Mrs. M. Alok,
National
Planning Office